We Added an addition with basement off the back, replaced all the windows, trim, siding, doors, and roof.
We added new larger size windows, re-framed the front door opening and added a new front door, new style trim, new columns with cultured stone, added cultured stone on front of garage.
Completely gutted the lower level and reconfigured living space to open concept.
Stairs were remade to give front entrance more space.
2nd floor: New master bath, main bath, hardwood floors, carpet, trim, base and crown molding, and paint.